0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 25 July 2001
Completion: 23 December 2007
Status: in use

Project Type

Function / usage: High-speed rail line

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 170.2 km
number of bridges 23 (5.9 km)
number of tunnels 7 (19.4 km)
length of newly built track 155.9 km

Design Loads

design speed 250 - 300 km/h

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    10000089
  • Published on:
    15/05/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine