0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Drava River Motorway Bridge (A5)

General Information

Status: under construction

Project Type

Location

Location: , ,
Crosses:
  • Drava River
Coordinates: 45° 37' 3.39" N    18° 35' 5.09" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 485 m
pylons height 75 m
main bridge
total length 420 m
span lengths 100 m - 220 m - 100 m
number of spans 3

Case Studies and Applied Products

RESTON®STU – Shock Transmission Units

RESTON®STU – Shock Transmission Units

The mageba Shock Transmission Unit (STU) is designed to be connected between bridge structure components to form a rigid link under dynamic loads induced by forces such as vehicle braking and earthquakes. It can be used for strengthening ... [more]

Participants

Contractor
Shock absorbers
Formwork & shoring

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070519
  • Published on:
    21/01/2016
  • Last updated on:
    01/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine