Media File No. 251563
Two 75 m high, A‑shaped pylons carry the three main bridge segments with a total length of 420 m. Efficient construction had been ensured by Peri engineers by combining the CB and RCS climbing systems to create a customized formwork solution
|
More media of this structureMore media for this product/service available at: |