Media File No. 251565
On the forward and reversed-inclined outer walls, the rail-guided RCS formwork was climbed by means of mobile hydraulic units; the CB climbing formwork on the front sides was moved to the next casting segment by crane. For this project, this combination provided the optimum solution regarding speed and material costs.
|
More media of this structureMore media for this product/service available at: |