General Information
Completion: | 13 December 2010 |
---|---|
Status: | in use |
Project Type
Structure: |
Multiple-span cable-stayed bridge |
---|---|
Function / usage: |
Road bridge |
Location
Location: |
Busan, South Korea |
---|---|
Part of: | |
Coordinates: | 35° 1' 2.88" N 128° 43' 41.83" E |
Technical Information
Dimensions
main span | 230.0 m | |
length of side spans | 106.0 m |
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Design
Wind tunnel testing
Main contractor
Expansion joints
Relevant Web Sites
Relevant Publications
- Design and construction of Busan–Geoje fixed link, S. Korea. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 163, n. 2 (June 2010), pp. 59-66. (2010):
- Final stretch. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 8.
- Full exposure. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 28-30. (2010):
- Legs on track. In: Bridge Update, n. 80 (December 2008), pp. 2.
- Vision on. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 32-33. (2008):
- About this
data sheet - Structure-ID
20014428 - Published on:
16/11/2004 - Last updated on:
18/02/2023