Design and construction of Busan–Geoje fixed link, S. Korea
Author(s): |
Andrew Yeoward
Im Sig Koo Don Fraser |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, June 2010, n. 2, v. 163 |
Page(s): | 59-66 |
DOI: | 10.1680/bren.2010.163.2.59 |
Structures and Projects
- About this
data sheet - Reference-ID
10086543 - Published on:
11/11/2018 - Last updated on:
11/11/2018