Doubling up
Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings
Author(s): |
Matthias Schüller
Prabhjeet Raj Singh Elie Homsi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Bridge Design & Engineering, 4th Quarter 2009, n. 57, v. 15 |
Page(s): | 46 |