0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Matthias Schüller

The following bibliography contains all the publications known to and listed in Structurae. The list may not provide a complete bibliography for this person.

  1. Pawlowski, Robert / Engelsmann, Stephan / Schlaich, Jörg / Schüller, Matthias (2019): Ingenieurbauführer: Baden-Württemberg. Bauwerk / Beuth-Verlag, Berlin (Germany), ISBN 978-3410249245, pp. 736.
  2. Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. In: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77.
  3. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 52.
  4. Singh, Prabhjeet Raj / Schüller, Matthias (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 30-31.
  5. Schüller, Matthias / Singh, Prabhjeet Raj / Homsi, Elie (2009): Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009), pp. 46.