Biographical Information
Name: | Matthias Schüller |
---|---|
Place(s) of activity: |
Bibliography
- Deh Cho Bridge im Norden Kanadas. In: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77. (2009):
- Fast mover. Effective use of software has been central to a redesign which took just five months. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 52. (2010):
- Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009), pp. 46. (2009):
- Golden challenge. In: Bridge Design & Engineering, v. 15, n. 56 (3rd Quarter 2009), pp. 28, 30-31. (2009):
- Brücken in Integralbauweise. Der La-Ferté-Steg in Stuttgart-Zuffenhausen. In: [ Umrisse ], v. 3, n. 2 ( 2003), pp. 25-27. (2003):
- About this
data sheet - Person-ID
1003092 - Published on:
04/12/2003 - Last updated on:
22/07/2014