Bibliographie
- Deh Cho Bridge im Norden Kanadas. Dans: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77. (2009):
- Fast mover. Effective use of software has been central to a redesign which took just five months. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 52. (2010):
- Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009), pp. 46. (2009):
- Golden challenge. Dans: Bridge Design & Engineering, v. 15, n. 56 (3e trimestre 2009), pp. 28, 30-31. (2009):
- Brücken in Integralbauweise. Der La-Ferté-Steg in Stuttgart-Zuffenhausen. Dans: [ Umrisse ], v. 3, n. 2 ( 2003), pp. 25-27. (2003):