Doubling up
Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings
Auteur(s): |
Matthias Schüller
Prabhjeet Raj Singh Elie Homsi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Bridge Design & Engineering, 4e trimestre 2009, n. 57, v. 15 |
Page(s): | 46 |