Doubling up
Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings
Autor(en): |
Matthias Schüller
Prabhjeet Raj Singh Elie Homsi |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Bridge Design & Engineering, 4. Quartal 2009, n. 57, v. 15 |
Seite(n): | 46 |