Elie Homsi
- Central Artery/Tunnel Project: Innovative Use of Precast Segmental Technology. Dans: PCI Journal, v. 45, n. 4 (juillet 2000). (2000):
- Central Artery/Tunnel project: innovative use of precast segmental technology. Dans: Structural Concrete, v. 3, n. 4 (décembre 2002). (2002):
- Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009). (2009):