Matthias Schüller
-
Pawlowski, Robert / Engelsmann, Stephan / Schlaich, Jörg / Schüller, Matthias (2019): Ingenieurbauführer: Baden-Württemberg. Bauwerk / Beuth-Verlag, Berlin (Allemagne), ISBN 978-3410249245, pp. 736.
-
Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. Dans: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77.
-
Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 52.
-
Singh, Prabhjeet Raj / Schüller, Matthias (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 30-31.
-
Schüller, Matthias / Singh, Prabhjeet Raj / Homsi, Elie (2009): Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009), pp. 46.