Prabhjeet Raj Singh
- Fast mover. Effective use of software has been central to a redesign which took just five months. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010). (2010):
- Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010). (2010):
- Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009). (2009):
- Golden challenge. In: Bridge Design & Engineering, v. 15, n. 56 (3rd Quarter 2009). (2009):