Izmit Bay Suspension Bridge - Overview of the Project
|
Bibliographic Details
Author(s): |
Masahiro Yanagihara
Takeshi Kawakami A. Nebil Ozturk Fatih Zeybek |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015 | ||||
Published in: | IABSE Conference Nara 2015 | ||||
|
|||||
Page(s): | 142-143 | ||||
Total no. of pages: | 8 | ||||
Year: | 2015 | ||||
DOI: | 10.2749/222137815815774359 | ||||
Abstract: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including construction update, and schedule. |
||||
Keywords: |
suspension bridge large bridge construction Schedule
|