Izmit Bay Suspension Bridge - Overview of the Project
|
Détails bibliographiques
Auteur(s): |
Masahiro Yanagihara
Takeshi Kawakami A. Nebil Ozturk Fatih Zeybek |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015 | ||||
Publié dans: | IABSE Conference Nara 2015 | ||||
|
|||||
Page(s): | 142-143 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2015 | ||||
DOI: | 10.2749/222137815815774359 | ||||
Abstrait: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including construction update, and schedule. |
||||