Izmit Bay Suspension Bridge - Overview of the Project
|
Bibliografische Angaben
Autor(en): |
Masahiro Yanagihara
Takeshi Kawakami A. Nebil Ozturk Fatih Zeybek |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015 | ||||
Veröffentlicht in: | IABSE Conference Nara 2015 | ||||
|
|||||
Seite(n): | 142-143 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2015 | ||||
DOI: | 10.2749/222137815815774359 | ||||
Abstrakt: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including construction update, and schedule. |
||||
Stichwörter: |
Hängebrücke
|