Masahiro Yanagihara
- (2019): Active protection system for Main cable of suspension bridge against HGV or Hazardous material fires. Presented at: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019.
- (2013): Izmit Bay Suspension Bridge – Overview of the Project. Presented at: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013.
- (2014): Izmit Bay Suspension Bridge – Overview of the Project. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- (2015): Izmit Bay Suspension Bridge - Overview of the Project. Presented at: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015.
- (2017): IZMIT Bay Suspension Bridge – Advanced Post tensioning system. Presented at: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- Replacement of Bearings in the Golden Horn Bridges. In: Structural Engineering International, v. 10, n. 2 (May 2000). (2000):