Izmit Bay Suspension Bridge – Overview of the Project
|
Bibliographic Details
Author(s): |
Takeshi Kawakami
Masahiro Yanagihara Yasutsugu Yamasaki A. Nebil Ozturk Fatih Zeybek |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2057-2064 | ||||
Total no. of pages: | 8 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814068481 | ||||
Abstract: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including design, construction update, and schedule. |
||||
Keywords: |
suspension bridge design development large bridge construction Schedule
|