Izmit Bay Suspension Bridge – Overview of the Project
|
Détails bibliographiques
Auteur(s): |
Takeshi Kawakami
Masahiro Yanagihara Yasutsugu Yamasaki A. Nebil Ozturk Fatih Zeybek |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2057-2064 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814068481 | ||||
Abstrait: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including design, construction update, and schedule. |
||||
Mots-clé: |
pont suspendu
|