Abstrakt: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art, suitable design, well proven construction method adopted challenging technics, and financial success for the project. The paper deals with the project overview including design, construction update, and schedule. |
||||
Stichwörter: |
Hängebrücke
|