Izmit Bay Suspension Bridge – Overview of the Project
|
Bibliographic Details
Author(s): |
Takeshi Kawakami
Masahiro Yanagihara Yasutsugu Yamasaki Junichi Shaura Tomoo Kasuga Tunc Cetinkaya |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Published in: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-8 | ||||
Total no. of pages: | 8 | ||||
Year: | 2013 | ||||
DOI: | 10.2749/222137813808627884 | ||||
Abstract: |
The scale of the bridge and the tight schedule in the EPC contract requires the state of the art and robust design and well proven but challenging construction method leading to the technical and financial success of the project. The papers deals with the project overview and the design development from the tender stage to the detailed design stage for the substructure and the superstructure. |
||||
Keywords: |
seismic response suspension bridge design development aerodynamic stability large bridge construction
|