Seok-heon Yun
- 발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구 (Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 17, n. 1 (February 2017). (2017):
- 소규모 프로젝트의 설계-감리분리 제도 개선 분석 (Analysis for the Improvement of the Small-Scale Project Design-Supervision Separating System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 5 (October 2016). (2016):
- BIM 기술개발 현황분석을 통한 기술개발요소 도출 및 중요도 평가에 관한 연구 (An Study on the Element Technologies of BIM and Importance Analysis of Them through Technology Development Status Analysis). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (October 2014). (2014):
- Adoption of Virtual Technology to the Development of a BIM based PMIS. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (August 2013). (2013):
- 공동주택 개발 사업의 비용분석을 위한 시스템 다이내믹스 모델 개발 연구 (Development of a System Dynamics Model for Cost Analysis of Housing Development Projects). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 3 (June 2011). (2011):
- 아파트와 한옥의 LCC(Life Cycle Cost)분석 사례 연구 (A Case study of Life Cycle Cost Analysis on Apartment houses and Han-Ok). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (December 2010). (2010):
- 무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발 (Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (June 2010). (2010):
- 공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (June 2010). (2010):
- 철골세우기 작업의 영향요인별 현장생산성 측정 및 분석 (Productivity Measurement and Analysis on Factors in Steel Erection). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 2 (April 2009). (2009):
- 공동주택의 공기지연 원인분석 사레 연구 (A Case Study on Reason Analysis for Schedule Delay of Apartment House). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 1 (February 2009). (2009):
- 가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 4 (August 2008). (2008):
- 국내 철근공사 배근상세 개선방안에 관한 연구 (A Study on the Improvement of Reinforcing Bar Detailing). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 1 (February 2008). (2008):
- 4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 7, n. 3 (September 2007). (2007):
- Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction. In: Architectural Research, v. 15, n. 3 (September 2013). (2013):
- Preliminary study for performance analysis of BIM-based building construction simulation system. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014). (2014):
- A laser-technology-based lifting-path tracking system for a robotic tower crane. In: Automation in Construction, v. 18, n. 7 (November 2009). (2009):
- A BIM- and sensor-based tower crane navigation system for blind lifts. In: Automation in Construction, v. 26 (October 2012). (2012):