0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Seok-heon Yun

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Kim, Ji-Yun / Yun, Seok-heon (2017): 발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구 (Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 17, n. 1 (Februar 2017).

    https://doi.org/10.5345/jkibc.2017.17.1.083

  2. Lee, Da-Un / Yun, Seok-heon (2016): 소규모 프로젝트의 설계-감리분리 제도 개선 분석 (Analysis for the Improvement of the Small-Scale Project Design-Supervision Separating System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 5 (Oktober 2016).

    https://doi.org/10.5345/jkibc.2016.16.5.447

  3. Kim, Ji-Yun / Lee, Da-Un / Song, A-Reum / Yun, Seok-heon (2014): BIM 기술개발 현황분석을 통한 기술개발요소 도출 및 중요도 평가에 관한 연구 (An Study on the Element Technologies of BIM and Importance Analysis of Them through Technology Development Status Analysis). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (Oktober 2014).

    https://doi.org/10.5345/jkibc.2014.14.5.497

  4. Suh, Bong-Gyo / Lee, Ghang / Yun, Seok-heon (2013): Adoption of Virtual Technology to the Development of a BIM based PMIS. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (August 2013).

    https://doi.org/10.5345/jkibc.2013.13.4.333

  5. Kim, Keun-Woo / Yun, Seok-heon (2011): 공동주택 개발 사업의 비용분석을 위한 시스템 다이내믹스 모델 개발 연구 (Development of a System Dynamics Model for Cost Analysis of Housing Development Projects). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 3 (Juni 2011).

    https://doi.org/10.5345/jkic.2011.06.3.221

  6. Kim, Keun-Woo / Yun, Seok-heon (2010): 아파트와 한옥의 LCC(Life Cycle Cost)분석 사례 연구 (A Case study of Life Cycle Cost Analysis on Apartment houses and Han-Ok). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (Dezember 2010).

    https://doi.org/10.5345/jkic.2010.12.6.001

  7. Yun, Seok-heon / Lee, Ghang (2010): 무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발 (Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (Juni 2010).

    https://doi.org/10.5345/jkic.2010.10.3.065

  8. Park, Won-Ho / Sim, Jae-Kwang / Yun, Seok-heon (2010): 공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (Juni 2010).

    https://doi.org/10.5345/jkic.2010.10.3.137

  9. Huh, Young-Ki / Lee, Ji-Yong / Yun, Seok-heon / Tae, Yong-Ho / Ahn, Bang-Ryul (2009): 철골세우기 작업의 영향요인별 현장생산성 측정 및 분석 (Productivity Measurement and Analysis on Factors in Steel Erection). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 2 (April 2009).

    https://doi.org/10.5345/jkic.2009.9.2.031

  10. Park, Chang-Wook / Yun, Seok-heon (2009): 공동주택의 공기지연 원인분석 사레 연구 (A Case Study on Reason Analysis for Schedule Delay of Apartment House). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 1 (Februar 2009).

    https://doi.org/10.5345/jkic.2009.9.1.089

  11. Park, Chang-Wook / Moon, Seung-Yun / Yun, Seok-heon (2008): 가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 4 (August 2008).

    https://doi.org/10.5345/jkic.2008.8.4.061

  12. Park, U-Yeol / Kim, Baek-Jung / Jung, Hyun-Ok / Yun, Seok-heon / Cho, Hun-Hee / Kang, Kyung-In (2008): 국내 철근공사 배근상세 개선방안에 관한 연구 (A Study on the Improvement of Reinforcing Bar Detailing). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 1 (Februar 2008).

    https://doi.org/10.5345/jkic.2008.8.1.083

  13. Jeon, Seung-Ho / Yun, Seok-heon / Paek, Joon-hong (2007): 4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 7, n. 3 (September 2007).

    https://doi.org/10.5345/jkic.2007.7.3.091

  14. Yun, Seok-heon / Kim, Sang-chul (2013): Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction. In: Architectural Research, v. 15, n. 3 (September 2013).

    https://doi.org/10.5659/aikar.2013.15.3.167

  15. Yun, Seok-heon / Jun, Ki-hyun / Son, Chang-baek / Kim, Sang-chul (2014): Preliminary study for performance analysis of BIM-based building construction simulation system. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (Januar 2014).

    https://doi.org/10.1007/s12205-014-0174-2

  16. Lee, Ghang / Kim, Hong-Hyun / Lee, Chi-Joo / Ham, Sung-Il / Yun, Seok-heon / Cho, Hunhee / Kim, Bong Keun / Kim, Gu Taek / Kim, Kyunghwan (2009): A laser-technology-based lifting-path tracking system for a robotic tower crane. In: Automation in Construction, v. 18, n. 7 (November 2009).

    https://doi.org/10.1016/j.autcon.2009.03.011

  17. Lee, Ghang / Cho, Joonbeom / Ham, Sungil / Lee, Taekwan / Lee, Gaang / Yun, Seok-heon / Yang, Hyung-Jun (2012): A BIM- and sensor-based tower crane navigation system for blind lifts. In: Automation in Construction, v. 26 (Oktober 2012).

    https://doi.org/10.1016/j.autcon.2012.05.002

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine