0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2010.10.3.137.
  • About this
    data sheet
  • Reference-ID
    10761970
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine