Won-Ho Park
- 공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (June 2010). (2010):