0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공동주택의 공기지연 원인분석 사레 연구 (A Case Study on Reason Analysis for Schedule Delay of Apartment House)

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5345/jkic.2009.9.1.089.
  • About this
    data sheet
  • Reference-ID
    10762078
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine