4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model)
Author(s): |
Seung-Ho Jeon
Seok-heon Yun Joon-hong Paek |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), September 2007, n. 3, v. 7 |
Page(s): | 91-98 |
DOI: | 10.5345/jkic.2007.7.3.091 |
- About this
data sheet - Reference-ID
10762179 - Published on:
15/03/2024 - Last updated on:
15/03/2024