Joon-hong Paek
- 해외 개발사업의 경쟁력향상을 위한 단계별 리스크 요인분석 - 개발도상국 신도시 개발사업을 중심으로 - (A Study on The Risk Factors to Strengthen the Competitiveness in the Overseas Development Projects - Focused on New Town development of Developing Country -). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 3 (June 2008). (2008):
- 4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 7, n. 3 (September 2007). (2007):
- Application of Earned Value in the Korean Construction Industry — A Case Study. In: Journal of Asian Architecture and Building Engineering, v. 7, n. 1 (May 2008). (2008):
- Korea Experience Project Management Consortium on the U.S. Forces Korea Relocation Program. In: Journal of Asian Architecture and Building Engineering, v. 7, n. 1 (May 2008). (2008):