0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Application of Earned Value in the Korean Construction Industry — A Case Study

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3130/jaabe.7.69.
  • About this
    data sheet
  • Reference-ID
    10331693
  • Published on:
    29/07/2019
  • Last updated on:
    29/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine