0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Monty Sutrisna

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Olanipekun, Ayokunle O. / Sutrisna, Monty (2021): Facilitating Digital Transformation in Construction—A Systematic Review of the Current State of the Art. In: Frontiers in Built Environment, v. 7 (January 2021).

    https://doi.org/10.3389/fbuil.2021.660758

  2. Sutrisna, Monty / Barrett, Peter (2007): Applying rich picture diagrams to model case studies of construction projects. In: Engineering, Construction and Architectural Management, v. 14, n. 2 (March 2007).

    https://doi.org/10.1108/09699980710731281

  3. Sutrisna, Monty / Kumaraswamy, Mohan M. (2015): Advanced ICT and smart systems for innovative "engineering, construction and architectural management". In: Engineering, Construction and Architectural Management, v. 22, n. 5 (September 2015).

    https://doi.org/10.1108/ecam-07-2015-0120

  4. Seki, Yuri / Sutrisna, Monty / Olanipekun, Ayokunle Olubunmi (2021): Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. In: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021).

    https://doi.org/10.1108/ecam-05-2020-0342

  5. Sutrisna, Monty / Goulding, Jack (2019): Managing information flow and design processes to reduce design risks in offsite construction projects. In: Engineering, Construction and Architectural Management, v. 26, n. 2 (March 2019).

    https://doi.org/10.1108/ecam-11-2017-0250

  6. Cooper-Cooke, Barry / Sutrisna, Monty / Olatunji, Oluwole Alfred (2020): Innovation in the globalised world: educating future building professionals. In: Construction Economics and Building, v. 20, n. 3 (September 2020).

    https://doi.org/10.5130/ajceb.v20i3.7410

  7. Sutrisna, Monty / Ramnauth, Vasheest / Zaman, Atiq: Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders. In: Architectural Engineering and Design Management.

    https://doi.org/10.1080/17452007.2020.1807306

  8. Hudson, Fraser Scott / Sutrisna, Monty / Chawynski, Gregory (2020): A certification framework for managing the risks of non-compliance and non-conformance building products: a Western Australian perspective. In: International Journal of Building Pathology and Adaptation, v. 39, n. 2 (May 2020).

    https://doi.org/10.1108/ijbpa-11-2019-0097

  9. Yi, Wen / Sutrisna, Monty (2020): Drone scheduling for construction site surveillance. In: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 1 (19 December 2020).

    https://doi.org/10.1111/mice.12593

  10. Hammad, Ahmed WA / Grzybowska, Hanna / Sutrisna, Monty / Akbarnezhad, Ali / Haddad, Assed (2019): A novel mathematical optimisation model for the scheduling of activities in modular construction factories. In: Construction Management and Economics, v. 38, n. 6 (September 2019).

    https://doi.org/10.1080/01446193.2019.1682174

  11. Picornell, Miguel / Pellicer, Eugenio / Torres-Machi, Cristina / Sutrisna, Monty (2017): Implementation of Earned Value Management in Unit-Price Payment Contracts. In: Journal of Management in Engineering (ASCE), v. 33, n. 3 (May 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000500

  12. Perera, Nihal Ananda / Sutrisna, Monty / Yiu, Tak Wing (2016): Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000441

  13. Short, C. Alan / Barrett, Peter / Dye, Anne / Sutrisna, Monty (2007): Impacts of value engineering on five Capital Arts projects. In: Building Research & Information, v. 35, n. 3 ( 2007).

    https://doi.org/10.1080/09613210601132652

  14. Ramanayaka, Chamila D. D. / Sutrisna, Monty (2017): Securing clients' objectives throughout construction project lifecycles. In: Built Environment Project and Asset Management, v. 7, n. 3 (July 2017).

    https://doi.org/10.1108/bepam-05-2017-0028

  15. Hastie, James / Sutrisna, Monty / Egbu, Charles (2017): Modelling knowledge integration process in early contractor involvement procurement at tender stage – a Western Australian case study. In: Construction Innovation, v. 17, n. 4 (October 2017).

    https://doi.org/10.1108/ci-04-2016-0021

  16. Arif, Mohammed / Bendi, Deepthi / Toma‐Sabbagh, Tahsin / Sutrisna, Monty (2012): Construction waste management in India: an exploratory study. In: Construction Innovation, v. 12, n. 2 (April 2012).

    https://doi.org/10.1108/14714171211215912

  17. Sutrisna, Monty / Ramanayaka, Chamila D.  D / Goulding, Jack S. (2018): Developing work breakdown structure matrix for managing offsite construction projects. In: Architectural Engineering and Design Management, v. 14, n. 5 (July 2018).

    https://doi.org/10.1080/17452007.2018.1477728

  18. Nibbelink, Jan-Gaebriel / Sutrisna, Monty / Zaman, Atiq U. (2017): Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective. In: Architectural Engineering and Design Management, v. 13, n. 6 (October 2017).

    https://doi.org/10.1080/17452007.2017.1348334

  19. Sterry, Pat / Sutrisna, Monty (2007): Briefing and Designing Performing Arts Buildings: Assessing the Role of Secondary Project Stakeholders. In: Architectural Engineering and Design Management, v. 3, n. 4 (January 2007).

    https://doi.org/10.1080/17452007.2007.9684643

  20. Barrett, Peter / Sutrisna, Monty (2009): Methodological strategies to gain insights into informality and emergence in construction project case studies. In: Construction Management and Economics, v. 27, n. 10 (October 2009).

    https://doi.org/10.1080/01446190903273943

  21. Chong, Heap-Yih / Fan, Su-Ling / Sutrisna, Monty / Hsieh, Shang-Hsien / Tsai, Ching-Mei (2017): Preliminary Contractual Framework for BIM-Enabled Projects. In: Journal of Construction Engineering and Management, v. 143, n. 7 (July 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001278

Search for a publication...

Only available with
My Structurae