0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Atapattu, Chinthaka Niroshan / Domingo, Niluka / Sutrisna, Monty (2023): Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception. Dans: Built Environment Project and Asset Management, v. 13, n. 5 (juin 2023).

    https://doi.org/10.1108/bepam-07-2022-0105

  2. Le, An Thi Hoai / Sutrisna, Monty: Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-07-2022-0619

  3. Olanipekun, Ayokunle O. / Sutrisna, Monty (2021): Facilitating Digital Transformation in Construction—A Systematic Review of the Current State of the Art. Dans: Frontiers in Built Environment, v. 7 (janvier 2021).

    https://doi.org/10.3389/fbuil.2021.660758

  4. Sutrisna, Monty / Barrett, Peter (2007): Applying rich picture diagrams to model case studies of construction projects. Dans: Engineering, Construction and Architectural Management, v. 14, n. 2 (mars 2007).

    https://doi.org/10.1108/09699980710731281

  5. Sutrisna, Monty / Kumaraswamy, Mohan M. (2015): Advanced ICT and smart systems for innovative "engineering, construction and architectural management". Dans: Engineering, Construction and Architectural Management, v. 22, n. 5 (septembre 2015).

    https://doi.org/10.1108/ecam-07-2015-0120

  6. Seki, Yuri / Sutrisna, Monty / Olanipekun, Ayokunle Olubunmi (2021): Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Dans: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021).

    https://doi.org/10.1108/ecam-05-2020-0342

  7. Sutrisna, Monty / Goulding, Jack (2019): Managing information flow and design processes to reduce design risks in offsite construction projects. Dans: Engineering, Construction and Architectural Management, v. 26, n. 2 (mars 2019).

    https://doi.org/10.1108/ecam-11-2017-0250

  8. Cooper-Cooke, Barry / Sutrisna, Monty / Olatunji, Oluwole Alfred (2020): Innovation in the globalised world: educating future building professionals. Dans: Construction Economics and Building, v. 20, n. 3 (septembre 2020).

    https://doi.org/10.5130/ajceb.v20i3.7410

  9. Sutrisna, Monty / Ramnauth, Vasheest / Zaman, Atiq (2022): Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders. Dans: Architectural Engineering and Design Management, v. 18, n. 3 (janvier 2022).

    https://doi.org/10.1080/17452007.2020.1807306

  10. Hudson, Fraser Scott / Sutrisna, Monty / Chawynski, Gregory (2020): A certification framework for managing the risks of non-compliance and non-conformance building products: a Western Australian perspective. Dans: International Journal of Building Pathology and Adaptation, v. 39, n. 2 (mai 2020).

    https://doi.org/10.1108/ijbpa-11-2019-0097

  11. Yi, Wen / Sutrisna, Monty (2021): Drone scheduling for construction site surveillance. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 1 (19 décembre 2021).

    https://doi.org/10.1111/mice.12593

  12. Hammad, Ahmed WA / Grzybowska, Hanna / Sutrisna, Monty / Akbarnezhad, Ali / Haddad, Assed (2019): A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Dans: Construction Management and Economics, v. 38, n. 6 (septembre 2019).

    https://doi.org/10.1080/01446193.2019.1682174

  13. Picornell, Miguel / Pellicer, Eugenio / Torres-Machi, Cristina / Sutrisna, Monty (2017): Implementation of Earned Value Management in Unit-Price Payment Contracts. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 3 (mai 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000500

  14. Perera, Nihal Ananda / Sutrisna, Monty / Yiu, Tak Wing (2016): Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000441

  15. Short, C. Alan / Barrett, Peter / Dye, Anne / Sutrisna, Monty (2007): Impacts of value engineering on five Capital Arts projects. Dans: Building Research & Information, v. 35, n. 3 ( 2007).

    https://doi.org/10.1080/09613210601132652

  16. Ramanayaka, Chamila D. D. / Sutrisna, Monty (2017): Securing clients' objectives throughout construction project lifecycles. Dans: Built Environment Project and Asset Management, v. 7, n. 3 (juillet 2017).

    https://doi.org/10.1108/bepam-05-2017-0028

  17. Hastie, James / Sutrisna, Monty / Egbu, Charles (2017): Modelling knowledge integration process in early contractor involvement procurement at tender stage – a Western Australian case study. Dans: Construction Innovation, v. 17, n. 4 (octobre 2017).

    https://doi.org/10.1108/ci-04-2016-0021

  18. Arif, Mohammed / Bendi, Deepthi / Toma‐Sabbagh, Tahsin / Sutrisna, Monty (2012): Construction waste management in India: an exploratory study. Dans: Construction Innovation, v. 12, n. 2 (avril 2012).

    https://doi.org/10.1108/14714171211215912

  19. Sutrisna, Monty / Ramanayaka, Chamila D. D. / Goulding, Jack S. (2018): Developing work breakdown structure matrix for managing offsite construction projects. Dans: Architectural Engineering and Design Management, v. 14, n. 5 (juillet 2018).

    https://doi.org/10.1080/17452007.2018.1477728

  20. Nibbelink, Jan-Gaebriel / Sutrisna, Monty / Zaman, Atiq U. (2017): Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective. Dans: Architectural Engineering and Design Management, v. 13, n. 6 (octobre 2017).

    https://doi.org/10.1080/17452007.2017.1348334

  21. Sterry, Pat / Sutrisna, Monty (2007): Briefing and Designing Performing Arts Buildings: Assessing the Role of Secondary Project Stakeholders. Dans: Architectural Engineering and Design Management, v. 3, n. 4 (janvier 2007).

    https://doi.org/10.1080/17452007.2007.9684643

  22. Barrett, Peter / Sutrisna, Monty (2009): Methodological strategies to gain insights into informality and emergence in construction project case studies. Dans: Construction Management and Economics, v. 27, n. 10 (octobre 2009).

    https://doi.org/10.1080/01446190903273943

  23. Chong, Heap-Yih / Fan, Su-Ling / Sutrisna, Monty / Hsieh, Shang-Hsien / Tsai, Ching-Mei (2017): Preliminary Contractual Framework for BIM-Enabled Projects. Dans: Journal of Construction Engineering and Management, v. 143, n. 7 (juillet 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001278

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine