Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective
Auteur(s): |
Jan-Gaebriel Nibbelink
Monty Sutrisna Atiq U. Zaman |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Architectural Engineering and Design Management, octobre 2017, n. 6, v. 13 |
Page(s): | 439-456 |
DOI: | 10.1080/17452007.2017.1348334 |
- Informations
sur cette fiche - Reference-ID
10301733 - Publié(e) le:
28.02.2019 - Modifié(e) le:
28.02.2019