0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 6, v. 31
Page(s): 2513-2535
DOI: 10.1108/ecam-07-2022-0619
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-07-2022-0619.
  • About this
    data sheet
  • Reference-ID
    10714426
  • Published on:
    21/03/2023
  • Last updated on:
    20/09/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine