0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Xu, Peng / Sun, Quanxin / Liu, Rengkui / Souleyrette, Reginald R. (2016): Optimal Match Method for Milepoint Postprocessing of Track Condition Data from Subway Track Geometry Cars. In: Journal of Transportation Engineering, v. 142, n. 8 (August 2016).

    https://doi.org/10.1061/(asce)te.1943-5436.0000859

  2. An, Ru / Sun, Quanxin / Wang, Futian / Bai, Wenfei / Zhu, Xingyong / Liu, Rengkui (2018): Improved Railway Track Geometry Degradation Modeling for Tamping Cycle Prediction. In: Journal of Transportation Engineering, Part A: Systems, v. 144, n. 7 (July 2018).

    https://doi.org/10.1061/jtepbs.0000149

  3. Tang, Yuanjie / Sun, Quanxin / Liu, Rengkui / Wang, Futian (2018): Resource Leveling Based on Line of Balance and Constraint Programming. In: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 10 (September 2018).

    https://doi.org/10.1111/mice.12383

  4. Tang, Yuanjie / Liu, Rengkui / Wang, Futian / Sun, Quanxin / Kandil, Amr A. (2018): Scheduling Optimization of Linear Schedule with Constraint Programming. In: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 2 (February 2018).

    https://doi.org/10.1111/mice.12277

  5. Xu, Peng / Sun, Quanxin / Liu, Rengkui / Souleyrette, Reginald R. / Wang, Futian (2015): Optimizing the Alignment of Inspection Data from Track Geometry Cars. In: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 1 (December 2015).

    https://doi.org/10.1111/mice.12067

  6. Tang, Yuanjie / Liu, Rengkui / Sun, Quanxin (2014): Schedule control model for linear projects based on linear scheduling method and constraint programming. In: Automation in Construction, v. 37 (January 2014).

    https://doi.org/10.1016/j.autcon.2013.09.008

  7. Tang, Yuanjie / Liu, Rengkui / Sun, Quanxin (2014): Two-Stage Scheduling Model for Resource Leveling of Linear Projects. In: Journal of Construction Engineering and Management, v. 140, n. 7 (July 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000862

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine