Schedule control model for linear projects based on linear scheduling method and constraint programming
Author(s): |
Yuanjie Tang
Rengkui Liu Quanxin Sun |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, January 2014, v. 37 |
Page(s): | 22-37 |
DOI: | 10.1016/j.autcon.2013.09.008 |
- About this
data sheet - Reference-ID
10190317 - Published on:
07/12/2018 - Last updated on:
07/12/2018