Two-Stage Scheduling Model for Resource Leveling of Linear Projects
Author(s): |
Yuanjie Tang
Rengkui Liu Quanxin Sun |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, July 2014, n. 7, v. 140 |
Page(s): | 04014022 |
DOI: | 10.1061/(asce)co.1943-7862.0000862 |
- About this
data sheet - Reference-ID
10170330 - Published on:
02/12/2018 - Last updated on:
02/12/2018