Quanxin Sun
- Optimal Match Method for Milepoint Postprocessing of Track Condition Data from Subway Track Geometry Cars. Dans: Journal of Transportation Engineering, v. 142, n. 8 (août 2016). (2016):
- Improved Railway Track Geometry Degradation Modeling for Tamping Cycle Prediction. Dans: Journal of Transportation Engineering, Part A: Systems, v. 144, n. 7 (juillet 2018). (2018):
- Resource Leveling Based on Line of Balance and Constraint Programming. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 10 (septembre 2018). (2018):
- Scheduling Optimization of Linear Schedule with Constraint Programming. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 2 (février 2018). (2018):
- Optimizing the Alignment of Inspection Data from Track Geometry Cars. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 1 (décembre 2015). (2015):
- Schedule control model for linear projects based on linear scheduling method and constraint programming. Dans: Automation in Construction, v. 37 (janvier 2014). (2014):
- Two-Stage Scheduling Model for Resource Leveling of Linear Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014). (2014):