  1. Huynh, Huu T. / Lucko, Gunnar / Eid, Mohamed S. (2023): Game Theory Approach for Concurrent Delay Analysis. In: Journal of Construction Engineering and Management, v. 149, n. 3 (March 2023).

    https://doi.org/10.1061/jcemd4.coeng-12947

  2. González-Cruz, Maria-Carmen / Ballesteros-Pérez, Pablo / Lucko, Gunnar / Zhang, Jing-Xiao (2022): Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information. In: Journal of Construction Engineering and Management, v. 148, n. 11 (November 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002387

  3. Ngo, Kiet A. / Lucko, Gunnar / Ballesteros-Pérez, Pablo (2022): Continuous earned value management with singularity functions for comprehensive project performance tracking and forecasting. In: Automation in Construction, v. 143 (November 2022).

    https://doi.org/10.1016/j.autcon.2022.104583

  4. Gomes Araújo, Lissa / Lucko, Gunnar (2022): Best Practices for Case Studies in Construction Engineering and Management Research. In: Journal of Construction Engineering and Management, v. 148, n. 8 (August 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002312

  5. Ezzeddine, Ali / Shehab, Lynn / Lucko, Gunnar / Hamzeh, Farook (2022): Forecasting Construction Project Performance with Momentum Using Singularity Functions in LPS. In: Journal of Construction Engineering and Management, v. 148, n. 8 (August 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002320

  6. Lucko, Gunnar / Alves, Thaís da C. L. / Angelim, Vanessa Lira (2013): Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. In: Construction Management and Economics, v. 32, n. 6 (April 2013).

    https://doi.org/10.1080/01446193.2013.845305

  7. Katsuragawa, Clara Mariana / Lucko, Gunnar / Isaac, Shabtai / Su, Yi (2021): Fuzzy Linear and Repetitive Scheduling for Construction Projects. In: Journal of Construction Engineering and Management, v. 147, n. 3 (March 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001996

  8. Su, Yi / Lucko, Gunnar / Thompson, Richard C. (2020): Apportioning Contract Float with Voting Methods to Correlated Activities in Network Schedules to Protect Construction Projects from Delays. In: Automation in Construction, v. 118 (October 2020).

    https://doi.org/10.1016/j.autcon.2020.103263

  9. Ballesteros-Pérez, Pablo / Sanz-Ablanedo, Enoc / Cerezo-Narváez, Alberto / Lucko, Gunnar / Pastor-Fernández, Andrés / Otero-Mateo, Manuel / Contreras-Samper, Juan Pablo (2020): Forecasting Accuracy of In-Progress Activity Duration and Cost Estimates. In: Journal of Construction Engineering and Management, v. 146, n. 9 (September 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001900

  10. Lucko, Gunnar / Su, Yi (2018): Precedence permutation patterns creating criticality constellations: Exploring a conjecture on nonlinear activities with continuous links. In: Organization, Technology and Management in Construction, v. 10, n. 1 (November 2018).

    https://doi.org/10.1515/otmcj-2016-0023

  11. Lucko, Gunnar (2016): Financial Planning and Management Practices of Electrical Contractors. In: Organization, Technology and Management in Construction, v. 8, n. 1 (December 2016).

    https://doi.org/10.1515/otmcj-2016-0011

  12. Su, Yi / Lucko, Gunnar (2015): Comparison and Renaissance of Classic Line-of-Balance and Linear Schedule Concepts for Construction Industry. In: Organization, Technology and Management in Construction, v. 7, n. 2 (November 2015).

    https://doi.org/10.5592/otmcj.2015.2.6

  13. Lucko, Gunnar / Mitchell, Zane W. (2010): Quantitative Research: Preparation of Incongruous Economic Data Sets for Archival Data Analysis. In: Journal of Construction Engineering and Management, v. 136, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000078

  14. Lucko, Gunnar / Rojas, Eddy M. (2010): Research Validation: Challenges and Opportunities in the Construction Domain. In: Journal of Construction Engineering and Management, v. 136, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000025

  15. Duzkale, Abdulhamit Kayihan / Lucko, Gunnar (2016): Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: II. Comparative Analysis and Quantitative C-I-V-I-L Classification. In: Journal of Construction Engineering and Management, v. 142, n. 10 (October 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001124

  16. Duzkale, Abdulhamit Kayihan / Lucko, Gunnar (2016): Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: I. Conceptual Framework and Qualitative C-I-V-I-L Classification. In: Journal of Construction Engineering and Management, v. 142, n. 10 (October 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001117

  17. Su, Yi / Isaac, Shabtai / Lucko, Gunnar (2018): Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001450

  18. Lucko, Gunnar (2011): Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing. In: Journal of Construction Engineering and Management, v. 137, n. 7 (July 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000324

  19. Lucko, Gunnar (2011): Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions. In: Journal of Construction Engineering and Management, v. 137, n. 1 (January 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000244

  20. Su, Yi / Lucko, Gunnar (2016): Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions. In: Automation in Construction, v. 70 (October 2016).

    https://doi.org/10.1016/j.autcon.2016.05.011

  21. Lucko, Gunnar / Said, Hisham M. M. / Bouferguene, Ahmed (2014): Construction spatial modeling and scheduling with three-dimensional singularity functions. In: Automation in Construction, v. 43 (July 2014).

    https://doi.org/10.1016/j.autcon.2014.03.008

  22. Su, Yi / Lucko, Gunnar (2015): Optimum Present Value Scheduling Based on Synthetic Cash Flow Model with Singularity Functions. In: Journal of Construction Engineering and Management, v. 141, n. 11 (November 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001011

  23. Lucko, Gunnar (2008): Productivity Scheduling Method Compared to Linear and Repetitive Project Scheduling Methods. In: Journal of Construction Engineering and Management, v. 134, n. 9 (September 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:9(711)

  24. Lucko, Gunnar (2009): Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions. In: Journal of Construction Engineering and Management, v. 135, n. 4 (April 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:4(246)

  25. Lucko, Gunnar / Peña Orozco, Angel A. (2009): Float Types in Linear Schedule Analysis with Singularity Functions. In: Journal of Construction Engineering and Management, v. 135, n. 5 (May 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000007

  26. Shapira, Aviad / Lucko, Gunnar / Schexnayder, Clifford J. (2007): Cranes for Building Construction Projects. In: Journal of Construction Engineering and Management, v. 133, n. 9 (September 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:9(690)

  27. Lucko, Gunnar / De La Garza, Jesus M. (2003): Constructability Considerations for Balanced Cantilever Construction. In: Practice Periodical on Structural Design and Construction, v. 8, n. 1 (February 2003).

    https://doi.org/10.1061/(asce)1084-0680(2003)8:1(47)

  28. Su, Yi / Lucko, Gunnar / Thompson, Richard C. (2018): Application of Voting Theory to the Float Ownership Problem. In: Journal of Construction Engineering and Management, v. 144, n. 1 (January 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001410

  29. Said, Hisham M. M. / Lucko, Gunnar (2016): Float Types in Construction Spatial Scheduling. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001202

  30. Lucko, Gunnar (2011): Modeling the Residual Market Value of Construction Equipment under Changed Economic Conditions. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000279

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine