Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling
Author(s): |
Gunnar Lucko
Thaís da C. L. Alves Vanessa Lira Angelim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Management and Economics, April 2013, n. 6, v. 32 |
Page(s): | 575-594 |
DOI: | 10.1080/01446193.2013.845305 |
- About this
data sheet - Reference-ID
10611543 - Published on:
18/06/2021 - Last updated on:
18/06/2021