Productivity Scheduling Method Compared to Linear and Repetitive Project Scheduling Methods
Author(s): |
Gunnar Lucko
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2008, n. 9, v. 134 |
Page(s): | 711-720 |
DOI: | 10.1061/(asce)0733-9364(2008)134:9(711) |
- About this
data sheet - Reference-ID
10155494 - Published on:
07/12/2018 - Last updated on:
07/12/2018