0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Continuous earned value management with singularity functions for comprehensive project performance tracking and forecasting

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 143
Page(s): 104583
DOI: 10.1016/j.autcon.2022.104583
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2022.104583.
  • About this
    data sheet
  • Reference-ID
    10693882
  • Published on:
    22/09/2022
  • Last updated on:
    22/09/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine