Forecasting Accuracy of In-Progress Activity Duration and Cost Estimates
Author(s): |
Pablo Ballesteros-Pérez
Enoc Sanz-Ablanedo Alberto Cerezo-Narváez Gunnar Lucko Andrés Pastor-Fernández Manuel Otero-Mateo Juan Pablo Contreras-Samper |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2020, n. 9, v. 146 |
Page(s): | 04020104 |
DOI: | 10.1061/(asce)co.1943-7862.0001900 |
- About this
data sheet - Reference-ID
10426516 - Published on:
13/07/2020 - Last updated on:
13/07/2020