0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Leu, Sou-Sen / Wen, Pei-Hua / Gahi, Jasmine (2024): Study of Microtunneling Machine Selection under Geological Risk. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 10, n. 4 (December 2024).

    https://doi.org/10.1061/ajrua6.rueng-1286

  2. Leu, Sou-Sen / Shi, Jun-Yang (2024): Effective green building design assessment support using sequential multidisciplinary design optimization. In: Journal of Building Engineering, v. 96 (November 2024).

    https://doi.org/10.1016/j.jobe.2024.110543

  3. Leu, Sou-Sen / Huang, Kuang-Jen / Hung, Cathy Chang-Wei / Wu, Pei-Lin: Revolutionizing steel building project cost overrun risk assessment by Bayesian network. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-10-2022-0962

  4. Leu, Sou-Sen / Liu, Yanni / Wu, Pei-Lin (2023): Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis. In: Buildings, v. 13, n. 3 (26 February 2023).

    https://doi.org/10.3390/buildings13030667

  5. Leu, Sou-Sen / Yang, Chih-Yu / Hsu, Yao-Jen (2021): A Novel Development of TRIZ-Analogic Construction Interface Problem Identification and Solutions Framework. In: Advances in Civil Engineering, v. 2021 (January 2021).

    https://doi.org/10.1155/2021/7752258

  6. Leu, Sou-Sen / Chang, Ching-Miao (2015): Bayesian-network-based Fall Risk Evaluation of Steel Construction Projects By Fault Tree Transformation. In: Journal of Civil Engineering and Management, v. 21, n. 3 (February 2015).

    https://doi.org/10.3846/13923730.2014.890643

  7. Leu, Sou-Sen / Chen, An-Ting / Yang, Chung-Huei (1999): Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(207)

  8. Leu, Sou-Sen / Hong Son, Pham Vu / Hong Nhung, Pham Thi (2015): Hybrid Bayesian Fuzzy-Game Model for Improving the Negotiation Effectiveness of Construction Material Procurement. In: Journal of Computing in Civil Engineering, v. 29, n. 6 (November 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000434

  9. Leu, Sou-Sen / Hong Son, Pham Vu / Hong Nhung, Pham Thi (2014): Optimize negotiation price in construction procurement using Bayesian Fuzzy Game Model. In: KSCE Journal of Civil Engineering, v. 19, n. 6 (December 2014).

    https://doi.org/10.1007/s12205-014-0522-2

  10. Leu, Sou-Sen / Hwang, Shao-Ting (2001): Optimal Repetitive Scheduling Model with Shareable Resource Constraint. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(270)

  11. Leu, Sou-Sen / Yang, Chung-Huei (1999): GA-Based Multicriteria Optimal Model for Construction Scheduling. In: Journal of Construction Engineering and Management, v. 125, n. 6 (December 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:6(420)

  12. Leu, Sou-Sen / Tzeng, Bing-Rong (2000): A CPM-Based Construction Quality Inspection and Decision-Aid System. In: Computer-Aided Civil and Infrastructure Engineering, v. 15, n. 3 (May 2000).

    https://doi.org/10.1111/0885-9507.00187

  13. Leu, Sou-Sen / Chang, Shiu-Lin (2005): Digital image processing based approach for tunnel excavation faces. In: Automation in Construction, v. 14, n. 6 (December 2005).

    https://doi.org/10.1016/j.autcon.2005.02.004

  14. Leu, Sou-Sen / Chen, Chee-Nan / Chang, Shiu-Lin (2001): Data mining for tunnel support stability: neural network approach. In: Automation in Construction, v. 10, n. 4 (May 2001).

    https://doi.org/10.1016/s0926-5805(00)00078-9

  15. Leu, Sou-Sen / Yang, Chung-Huei / Huang, Jiun-Ching (2000): Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. In: Automation in Construction, v. 10, n. 1 (November 2000).

    https://doi.org/10.1016/s0926-5805(99)00011-4

  16. Leu, Sou-Sen / Hwang, Shao-Ting (2002): GA-based resource-constrained flow-shop scheduling model for mixed precast production. In: Automation in Construction, v. 11, n. 4 (June 2002).

    https://doi.org/10.1016/s0926-5805(01)00083-8

  17. Cheng, Ying-Mei / Leu, Sou-Sen (2008): Constraint-based clustering model for determining contract packages of bridge maintenance inspection. In: Automation in Construction, v. 17, n. 6 (August 2008).

    https://doi.org/10.1016/j.autcon.2007.12.001

  18. Leu, Sou-Sen / Pham, Vu Hong Son / Pham, Thi Hong Nhung (2015): Development of recursive decision making model in bilateral construction procurement negotiation. In: Automation in Construction, v. 53 (May 2015).

    https://doi.org/10.1016/j.autcon.2015.03.016

  19. Leu, Sou-Sen / Lin, You-Che (2008): Project Performance Evaluation Based on Statistical Process Control Techniques. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:10(813)

  20. Leu, Sou-Sen / Hung, Tzung-Heng (2002): A genetic algorithm-based optimal resource-constrained scheduling simulation model. In: Construction Management and Economics, v. 20, n. 2 (March 2002).

    https://doi.org/10.1080/01446190110109148

  21. Leu, Sou-Sen / Yang, Chung-Huei (1999): A genetic-algorithm-based resource-constrained construction scheduling system. In: Construction Management and Economics, v. 17, n. 6 (November 1999).

    https://doi.org/10.1080/014461999371105

  22. Leu, Sou-Sen / Chen, An-Ting / Yang, Chung-Huei (1999): A fuzzy optimal model for construction resource leveling scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 6 (December 1999).

    https://doi.org/10.1139/l99-028

  23. Leu, Sou-Sen / Hung, Tzung-Heng (2002): An optimal construction resource leveling scheduling simulation model. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 2 (April 2002).

    https://doi.org/10.1139/l02-007

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine