Sou-Sen Leu
- Bayesian-network-based Fall Risk Evaluation of Steel Construction Projects By Fault Tree Transformation. In: Journal of Civil Engineering and Management, v. 21, n. 3 (February 2015). (2015):
- Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999). (1999):
- Hybrid Bayesian Fuzzy-Game Model for Improving the Negotiation Effectiveness of Construction Material Procurement. In: Journal of Computing in Civil Engineering, v. 29, n. 6 (November 2015). (2015):
- Optimize negotiation price in construction procurement using Bayesian Fuzzy Game Model. In: KSCE Journal of Civil Engineering, v. 19, n. 6 (December 2014). (2014):
- Optimal Repetitive Scheduling Model with Shareable Resource Constraint. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- GA-Based Multicriteria Optimal Model for Construction Scheduling. In: Journal of Construction Engineering and Management, v. 125, n. 6 (December 1999). (1999):
- A CPM-Based Construction Quality Inspection and Decision-Aid System. In: Computer-Aided Civil and Infrastructure Engineering, v. 15, n. 3 (May 2000). (2000):
- Digital image processing based approach for tunnel excavation faces. In: Automation in Construction, v. 14, n. 6 (December 2005). (2005):
- Data mining for tunnel support stability: neural network approach. In: Automation in Construction, v. 10, n. 4 (May 2001). (2001):
- Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. In: Automation in Construction, v. 10, n. 1 (November 2000). (2000):
- GA-based resource-constrained flow-shop scheduling model for mixed precast production. In: Automation in Construction, v. 11, n. 4 (June 2002). (2002):
- Constraint-based clustering model for determining contract packages of bridge maintenance inspection. In: Automation in Construction, v. 17, n. 6 (August 2008). (2008):
- Development of recursive decision making model in bilateral construction procurement negotiation. In: Automation in Construction, v. 53 (May 2015). (2015):
- Project Performance Evaluation Based on Statistical Process Control Techniques. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008). (2008):
- A genetic algorithm-based optimal resource-constrained scheduling simulation model. In: Construction Management and Economics, v. 20, n. 2 (March 2002). (2002):
- A genetic-algorithm-based resource-constrained construction scheduling system. In: Construction Management and Economics, v. 17, n. 6 (November 1999). (1999):
- A fuzzy optimal model for construction resource leveling scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 6 (December 1999). (1999):
- An optimal construction resource leveling scheduling simulation model. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 2 (April 2002). (2002):