GA-Based Multicriteria Optimal Model for Construction Scheduling
Author(s): |
Sou-Sen Leu
Chung-Huei Yang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 1999, n. 6, v. 125 |
Page(s): | 420-427 |
DOI: | 10.1061/(asce)0733-9364(1999)125:6(420) |
- About this
data sheet - Reference-ID
10158044 - Published on:
11/12/2018 - Last updated on:
11/12/2018