GA-based resource-constrained flow-shop scheduling model for mixed precast production
Author(s): |
Sou-Sen Leu
Shao-Ting Hwang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, June 2002, n. 4, v. 11 |
Page(s): | 439-452 |
DOI: | 10.1016/s0926-5805(01)00083-8 |
- About this
data sheet - Reference-ID
10189288 - Published on:
07/12/2018 - Last updated on:
07/12/2018