Shao-Ting Hwang
- Optimal Repetitive Scheduling Model with Shareable Resource Constraint. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- GA-based resource-constrained flow-shop scheduling model for mixed precast production. In: Automation in Construction, v. 11, n. 4 (June 2002). (2002):