0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Leu, Sou-Sen / Wen, Pei-Hua / Gahi, Jasmine (2024): Study of Microtunneling Machine Selection under Geological Risk. Dans: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 10, n. 4 (décembre 2024).

    https://doi.org/10.1061/ajrua6.rueng-1286

  2. Leu, Sou-Sen / Shi, Jun-Yang (2024): Effective green building design assessment support using sequential multidisciplinary design optimization. Dans: Journal of Building Engineering, v. 96 (novembre 2024).

    https://doi.org/10.1016/j.jobe.2024.110543

  3. Leu, Sou-Sen / Huang, Kuang-Jen / Hung, Cathy Chang-Wei / Wu, Pei-Lin: Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-10-2022-0962

  4. Leu, Sou-Sen / Liu, Yanni / Wu, Pei-Lin (2023): Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis. Dans: Buildings, v. 13, n. 3 (26 février 2023).

    https://doi.org/10.3390/buildings13030667

  5. Leu, Sou-Sen / Yang, Chih-Yu / Hsu, Yao-Jen (2021): A Novel Development of TRIZ-Analogic Construction Interface Problem Identification and Solutions Framework. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).

    https://doi.org/10.1155/2021/7752258

  6. Leu, Sou-Sen / Chang, Ching-Miao (2015): Bayesian-network-based Fall Risk Evaluation of Steel Construction Projects By Fault Tree Transformation. Dans: Journal of Civil Engineering and Management, v. 21, n. 3 (février 2015).

    https://doi.org/10.3846/13923730.2014.890643

  7. Leu, Sou-Sen / Chen, An-Ting / Yang, Chung-Huei (1999): Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. Dans: Journal of Computing in Civil Engineering, v. 13, n. 3 (juillet 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(207)

  8. Leu, Sou-Sen / Hong Son, Pham Vu / Hong Nhung, Pham Thi (2015): Hybrid Bayesian Fuzzy-Game Model for Improving the Negotiation Effectiveness of Construction Material Procurement. Dans: Journal of Computing in Civil Engineering, v. 29, n. 6 (novembre 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000434

  9. Leu, Sou-Sen / Hong Son, Pham Vu / Hong Nhung, Pham Thi (2014): Optimize negotiation price in construction procurement using Bayesian Fuzzy Game Model. Dans: KSCE Journal of Civil Engineering, v. 19, n. 6 (décembre 2014).

    https://doi.org/10.1007/s12205-014-0522-2

  10. Leu, Sou-Sen / Hwang, Shao-Ting (2001): Optimal Repetitive Scheduling Model with Shareable Resource Constraint. Dans: Journal of Construction Engineering and Management, v. 127, n. 4 (août 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(270)

  11. Leu, Sou-Sen / Yang, Chung-Huei (1999): GA-Based Multicriteria Optimal Model for Construction Scheduling. Dans: Journal of Construction Engineering and Management, v. 125, n. 6 (décembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:6(420)

  12. Leu, Sou-Sen / Tzeng, Bing-Rong (2000): A CPM-Based Construction Quality Inspection and Decision-Aid System. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 15, n. 3 (mai 2000).

    https://doi.org/10.1111/0885-9507.00187

  13. Leu, Sou-Sen / Chang, Shiu-Lin (2005): Digital image processing based approach for tunnel excavation faces. Dans: Automation in Construction, v. 14, n. 6 (décembre 2005).

    https://doi.org/10.1016/j.autcon.2005.02.004

  14. Leu, Sou-Sen / Chen, Chee-Nan / Chang, Shiu-Lin (2001): Data mining for tunnel support stability: neural network approach. Dans: Automation in Construction, v. 10, n. 4 (mai 2001).

    https://doi.org/10.1016/s0926-5805(00)00078-9

  15. Leu, Sou-Sen / Yang, Chung-Huei / Huang, Jiun-Ching (2000): Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Dans: Automation in Construction, v. 10, n. 1 (novembre 2000).

    https://doi.org/10.1016/s0926-5805(99)00011-4

  16. Leu, Sou-Sen / Hwang, Shao-Ting (2002): GA-based resource-constrained flow-shop scheduling model for mixed precast production. Dans: Automation in Construction, v. 11, n. 4 (juin 2002).

    https://doi.org/10.1016/s0926-5805(01)00083-8

  17. Cheng, Ying-Mei / Leu, Sou-Sen (2008): Constraint-based clustering model for determining contract packages of bridge maintenance inspection. Dans: Automation in Construction, v. 17, n. 6 (août 2008).

    https://doi.org/10.1016/j.autcon.2007.12.001

  18. Leu, Sou-Sen / Pham, Vu Hong Son / Pham, Thi Hong Nhung (2015): Development of recursive decision making model in bilateral construction procurement negotiation. Dans: Automation in Construction, v. 53 (mai 2015).

    https://doi.org/10.1016/j.autcon.2015.03.016

  19. Leu, Sou-Sen / Lin, You-Che (2008): Project Performance Evaluation Based on Statistical Process Control Techniques. Dans: Journal of Construction Engineering and Management, v. 134, n. 10 (octobre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:10(813)

  20. Leu, Sou-Sen / Hung, Tzung-Heng (2002): A genetic algorithm-based optimal resource-constrained scheduling simulation model. Dans: Construction Management and Economics, v. 20, n. 2 (mars 2002).

    https://doi.org/10.1080/01446190110109148

  21. Leu, Sou-Sen / Yang, Chung-Huei (1999): A genetic-algorithm-based resource-constrained construction scheduling system. Dans: Construction Management and Economics, v. 17, n. 6 (novembre 1999).

    https://doi.org/10.1080/014461999371105

  22. Leu, Sou-Sen / Chen, An-Ting / Yang, Chung-Huei (1999): A fuzzy optimal model for construction resource leveling scheduling. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 6 (décembre 1999).

    https://doi.org/10.1139/l99-028

  23. Leu, Sou-Sen / Hung, Tzung-Heng (2002): An optimal construction resource leveling scheduling simulation model. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 2 (avril 2002).

    https://doi.org/10.1139/l02-007

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine