0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Resource leveling in construction by genetic algorithm-based optimization and its decision support system application

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , n. 1, v. 10
Page(s): 27-41
DOI: 10.1016/s0926-5805(99)00011-4
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/s0926-5805(99)00011-4.
  • About this
    data sheet
  • Reference-ID
    10189171
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine